Change Calendar

Displayed below is a calendar of scheduled changes. Click a change's short description to view its details, or navigate to another month with the Prev and Next links.
 
PrevApril 2015Next
SunMonTueWedThuFriSat
   1
-Enable Google Hangouts "Talk".
-Apply MS patches and Bios patch to EASQL1
-Humanities 202, 302, 295, and 396 switch migration to RN3 gear.
2
-IPS Policy Update
-Humanities 102 and 196 switch migration to RN3 gear.
3
-OS update to Storage, Rnas, and Crate filer. Firmware updates to Hitachi storage arrays.
-Upgrade Fusion 10 to SP1
-Update Matlab license to 2015a
4
5
6
7
-Ryon B28 and 224 closet switch migration to RN3 gear.
8
-Removal of AC unit from telephone equipment rack in Annex. AC unit needs repair.
9
-Anderson Architecture 308 RN3 network equipment upgrade
-Enable DNS caching name service on the RiceMail mail handlers.
-Move the 1 10x10G link on Fannin Street DWDM to the 2x10G interface in the DWDM
-migrate GCC and GCCKECK database to new hardware
10
-Upgrade Tableau Server to version 9.0
11
12
13
-Added robots.txt responder to docs.rice.edu and wiki.rice.edu
14
-RMC b24a and w-131 IT closet RN3 network equipment upgrade
15
-RMC 203a IT closet RN3 network equipment upgrade
-Higher Markets SciQuest Login change
-OS, patch and firmware updates to Isilon storage server
-Upgrade Deploy Studio from 1.6.3 to 1.6.13 on clonerdev.rice.edu
-System decommissioning notice: Yellowstone, Denali, and Yosemite
-Windows BitLocker GPO Modification
-CMS400 DB server EASQl2 will be patched and the BIOS re-configured.
16
-Gym 1.09.11 and 1.04.02 IT closet RN3 network equipment upgrade
-Update webmail.rice.edu SSL Certificate to SHA-2 signed certificate.
17
18
-Modify AD Schema to accommodate Microsoft SCCM.
19
20
21
-gym-2.06.07 network switch upgrade
22
-Firmware updates to Isilon storage server
23
24
25
26
27
28
29
30
-Upgrade remaining 8.0.2 CMS400 sites.